WESTSIDE COMMUNITY SCHOOLS PUBLIC NOTICES 6/7/23
WESTSIDE COMMUNITY SCHOOLS
Date: May 26, 2023
Westside Community Schools (hereinafter referred to as “the District” or “WCS”) invites bids on:
Gymnasium AHU Replacement
Westbrook Elementary School
1312 Robertson Drive
Omaha, NE
Bids are to be made on the bid form enclosed. One completed copy of the bid form is to be returned to the School District signed by the bidder.
Any questions concerning clarification of this bid should be directed to:
Andy Gilliam
Morrissey Engineering
4940 North 118th Street
Omaha, Nebraska 68164
Phone: (402) 491-4144
agilliam@morrisseyengineering.com
The School District reserves the right to accept or reject any or all bids or any part thereof and to waive any and all technicalities and irregularities should it deem to be in the best interest of the District to do so.
BIDS ARE DUE: 10:00 A.M. (CST), THURSDAY, JUNE 22, 2023
Submit bids in a sealed opaque envelope marked:
BID ENCLOSED
Westside High School –
Westbrook Elementary School
Gymnasium AHU Replacement
And addressed as follows:
Russ Olsen
Director of Facilities
Westside Community Schools
ABC Building
909 South 76th Street
Omaha, Nebraska 68114
Bidding documents may be examined at the office of the Engineer,
Morrissey Engineering
4940 North 118th Street
Omaha, Nebraska 68164
and at the following exchanges after May 26, 2023:
F.W. DODGE CORPORATION, 11422 Miracle
Hills Dr., Suite 206, Omaha, NE 68154
OMAHA BUILDERS EXCHANGE, 4159 So. 94th
Street, Omaha, NE 68127
Lincoln Builder’s Bureau, 5910 South 58th
Street, Suite C, Lincoln, NE 68516
A & D’s Virtual Plan Room, http://www.adtechplans.com/
Bidders may obtain Bidding Documents at the office of the printer,
A & D Technical Supply
4320 S 89th Street
Omaha, NE, 68127
(402) 592-4950
Documents will be available between the hours of 8:00 a.m. and 12:00 noon and 1:00 p.m. and 5:00 p.m., Monday through Friday. All bidders who require hard copies of bid documents shall place an order directly with A & D Technical Supply and shall pay all costs associated with printing and if applicable, all shipping costs. Only full and complete sets will be printed - partial set orders are not allowed. Hard copy bid documents do not need to be returned as no refund will be issued.
PART 1 - BIDDING INFORMATION
1.1 SCOPE OF THE PROJECT
Westbrook Elementary School has three existing air-handling units serving the gymnasium. WCS desires to replace these systems as they are near the end of their useful life and experiencing major failures. The project includes but is not limited to the following major elements:
Removal of the existing air-handling units.
Removal of existing hydronic piping to accommodate AHU replacement.
Removal of existing relief fans.
General demolition to accommodate project.
Installation of two new air-handling units.
Installation of new hydronic piping.
Installation of new motorized dampers.
Installation of new relief fans.
Installation of new DDC system.
Commissioning new equipment and controls.
Electrical modifications to accommodate new mechanical equipment.
Structural modifications to accommodate new mechanical equipment.
General Construction to accommodate new mechanical equipment.
6/7-6/22 ZNEZ
––––––––––––––––––––––––––––––––
Category:
User login
Omaha Daily Record
The Daily Record
222 South 72nd Street, Suite 302
Omaha, Nebraska
68114
United States
Tele (402) 345-1303
Fax (402) 345-2351