Skip to main content
Sunday, May 11, 2025
Home
Omaha Daily Record
  • Login
  • Home
  • Subscribe
  • Calendar
    • Real Estate
    • Small Business
    • Non-Profit
    • Political
    • Legal
  • Podcasts
    • Real Estate
    • Small Business
    • Non-Profit
    • Political
    • Legal
  • Profiles
    • Real Estate
    • Small Business
    • Non-Profit
    • Political
    • Legal
  • E-Edition
    • Current Issue
    • Archives
  • Real Estate News
    • Market Trends
  • Business News
  • Non-Profit News
  • Political News
  • Legal News
  • Editorial
    • Empower You
    • The Serial Entrepreneur
    • Tom Becka
  • Other News
  • Public Records
    • Wreck Permits
    • Building Permits
    • Electrical Permits
    • Mechanical Permits
    • Plumbing Permits
  • Real Estate Leads
    • Notice of Default
    • Active Property Sales
    • Active Probates
    • Deeds
  • Public Notices
    • State of Nebraska
    • City of Bennington
    • City of Gretna
    • City of Valley
    • Douglas County West Community Schools
    • Gretna Public Schools
    • Omaha Airport Authority
    • Omaha Housing Authority
    • Plattsmouth Community Schools
    • City of Omaha
    • Douglas County
      • Tax Delinqueny 2025
    • City/County Notice of Bids
    • City of Ralston
    • Omaha Public Schools
    • Millard Public Schools
    • Ralston Public Schools
    • Westside Community Schools
    • Bennington Public Schools
    • Learning Community
    • MAPA
    • MECA
    • Omaha Airport Authority
    • Village of Boys Town
    • Village of Waterloo
    • Sarpy County
      • Tax Delinquency 2025
    • City of Bellevue
  • Advertise
    • Place a Legal Notice
    • Place a Print Ad
    • Place a Classified Ad
    • Place an Online Ad
    • Place Sponsored Content
  • Available For Hire
    • Real Estate
      • Contractors
      • Clerical
    • Legal
      • Paralegal
      • Clerical
  • About
    • Our History
    • Our Office
    • Our Staff
    • Contact Us

You are here

Home » OMAHA AIRPORT AUTHORITY PUBLIC NOTICES 7/7/22

OMAHA AIRPORT AUTHORITY PUBLIC NOTICES 7/7/22

OMAHA AIRPORT AUTHORITY

REQUEST FOR QUALIFICATIONS

PROFESSIONAL ENGINEERING

CONSULTING SERVICES

MULTIPLE AIRPORT PROJECTS

MILLARD AIRPORT, OMAHA, NEBRASKA

INTRODUCTION

The Omaha Airport Authority is hereby soliciting statements of qualifications and experience from airport consultants for projects at Millard Airport, Omaha, Nebraska.

Subject to receipt of Federal funding, these projects may include the following:

Proposed Projects

(Estimated Construction Cost)

 

1.  Replace & Relocate Beacon ($250k-$350k)

2.  Replace PAPIs ($200k-$300k)

3.  Taxilane and Approach Reconstruction at  

      Hangars A, B, C, D, and E ($2.5M-$3.0M)

4.  Replace Runway Culverts & Regrade Safety 

      Area ($500k-$750k)

5.  Rehabilitate Runway ($2M-$2.5M)

6.  Runway Sealcoat ($200k-$300k)

7.  Runway Lighting ($600k-$750k)

8.  Rehabilitate Apron ($2.5M-$3M)

9.  Rehabilitate Access Road ($2M-$2.5M)

10. Tree Removal ($150k-$200k)

11. Rehabilitate Taxiway Z ($2.2M-$2.5M)

12. Associated work items and general airport

      engineering as applicable to the above

The required services include, but are not limited to Architectural/Engineering (A/E) for preliminary design, design,  bidding, and construction phases including incidental special services for projects funded under the Federal Aviation Administration (FAA) Airport Improvement Program (AIP) and/or Bipartisan Infrastructure Law (BIL) or other federal programs.

A qualification based selection process conforming to FAA Advisory Circular 150/5100-14E will be utilized. Fee information will not be considered in the selection process and must not be submitted with the statement of qualifications. Selection criteria will include: recent experience with airport projects, capability to perform all aspects of the projects, demonstrated ability to meet schedules within budget, quality of previous airport projects undertaken, interest shown, and the consultant’s qualifications.

Fees will be negotiated for each project as federal funds become available or are anticipated to become available. 

Prospective Consultants are advised that applied overhead rates must be in accordance with the cost principles established within Federal Regulation 48 CFR Part 31, Contract Cost Principles and Procedures.

Contracts are subject to the Federal Contract Provisions for A/E Agreements attached in Exhibit A. 

The specific work will follow the Capital Improvement Plan and Airport Layout Plan adopted (or as may be amended) for Millard Airport.  The Omaha Airport Authority intends to select a consulting firm to provide the designs to include any sub-consultants and Materials Testing Laboratories.  The work may be constructed beginning in 2023.  The consultant selected will manage airfield/airside projects as identified and undertaken within a period of five years via separate contracts to include reconstruction, new pavements and utility infrastructure per the Airport Layout Plan depending upon availability of funds and the consultants performance.

The Omaha Airport Authority has direct contact with the Federal Aviation Administration and Nebraska Department of Transportation (NDOT) for projects at Millard Airport. All consultant actions will be taken through the staff of the Omaha Airport Authority. Direct contact by the Consultant with the FAA or NDOT for Millard Airport work must have prior authorization by the Staff of the Omaha Airport Authority.

The purpose of this notice is to invite qualified, interested firms to submit a Statement of Qualifications.  In support of this invitation, the information presented in subsequent sections of this document is designed to acquaint interested firms with the specific information to be submitted, and how the consultant selection process will be accomplished by the Omaha Airport Authority.

Interested consultants may obtain a Request for Qualifications information packet from the Omaha Airport Authority by e-mailing Colleen Taul at colleen.taul@flyoma.com. The statement of qualifications submitted must follow the guidelines provided in the packet to be considered. Consultants desiring to be considered should submit six copies of their statement of qualifications with related experience and references to the following address no later than 2:00 p.m. August 5, 2022.

Omaha Airport Authority

Attention: Trevor Tonniges, P.E.

4501 Abbott Drive, Suite 2300

Omaha, Nebraska 68110

7/7, 7/11, 7/13             ZNEZ

––––––––––––––––––––––––––––––––

Category:

  • Omaha Airport Authority

User login

  • Request new password

            

Latest Podcasts

  • Real Estate
  • Political
  • Political
  • Real Estate

Nebraska Landlord

Betches Sup - A Liberal News Commentary

Ruthless - A Conservative News Commentary

REIA Radio Show

Omaha Daily Record

The Daily Record
222 South 72nd Street, Suite 302
Omaha, Nebraska
68114
United States

Tele (402) 345-1303
Fax (402) 345-2351
 

The Daily Record
222 South 72nd Street, Suite 302 | Omaha, Nebraska 68114 | United States | Tele (402) 345-1303 | Fax (402) 345-2351 | Sitemap
Site Design, Programming & Development by Surf New Media